Why is $400,042 advertised when the price is $424,900?
Because $400,042 is what is left after the enhanced GST/HST rebate. To Minto’s credit they print both numbers side by side on the price list, which most builders do not. But $424,900 is what you sign for, and the $24,858 rebate depends on you qualifying. Plan on the higher figure.
What is a hybrid stacked townhome?
Homes stacked over one another with their own front doors, rather than a corridor and a lift lobby like a condo tower. You get the feel of a town with the price and the fee structure of a condominium. Westshore mixes flats, garden-level homes and upper “sky” homes in the same block, which is where the price differences come from.
Occupancy is 2029. Is that a problem?
It is a long runway and the word on the price list is “tentative”. That cuts both ways: you have years to arrange your finances, but your deposit is committed for that whole time and your mortgage cannot be fully arranged yet. The date that binds anyone is the one written into your agreement, with its delay provisions — I read that with you before you sign.
What is the deposit?
15% of the purchase price, spread over more than a year: $5,000 on signing, the balance to 5% within 30 days, another 5% at 365 days, and the last 5% on occupancy. On the entry home that is roughly $63,735 in total, and about $106,185 on a $707,900 Sky Town. Cheques go to Bennett Jones LLP in trust. The twelve-month gap before the third payment is genuinely useful if you are selling something else first.
Is the maintenance fee good or bad?
$0.40 a square foot is low on its face. But it excludes hydro, hot water and cold water, and both the heating system and the air conditioning are rentals on top. Compare whole monthly costs, not fees — a higher fee that includes water and owns its equipment can work out cheaper.
Can I assign before closing?
Yes, and Minto charges no assignment fee — it is one of their limited-time incentives. Two conditions to understand: a legal fee still applies, and the assignment remains subject to the vendor’s approval, so it is a permission rather than a right. With occupancy three or four years out, this matters here more than at a project closing next year.